Today was the last full day of getting the boat inside the carrier. Still a few things left to do but all the heavy work is done.
The shelving that came inside the van was removed and installed inside the hauler.
The boat fits inside perfectly with extra space in the front.
The van is hooked up and parked in the driveway. Even if it snows again before Thursday I should be able to drive right out and head south.
Y-Flyer Midwinters in just 5 days.
No comments:
Post a Comment